Southwest Area Integrated Water Resources Planning and Management Project (Chenchuri Beel Suproject-Patesory Satbaria)

Assignment Name: Preparation of Resettlement Action Plan(RAP) for Southwest Area Integrated Water Resources Planning and Management Project (ChenchuriBeel Subproject)

Country : Bangladesh Assignment Location within country :

Narail (Sub-project)

Duration of assignment (months): 03

Name of Client: DevConsultants Ltd.

Total No. of staff-month of the assignment : 106

Start Date

(Month/Year):

September-2010

Completion Date (Month/Year):

November-2010

Name of Joint Venture /Associated Consultants, if any: N/A

 No. of Staff-Months of Key Professional Staff provided by Joint Venture /Associated Consultants: 0

Name of Senior Staff (Project Director /Coordinator, Team Leader) Involved and Functions Performed:

Kh. KhairulMatin

:

Resettlement Specialist

Md. Mustafizur Rahman

:

MIS Specialist

Sukhendra Narayan

:

Field Coordinator

Description of Project: The Government of Bangladesh, with the financial assistance of the Asian Development Bank has undertaken a project through Bangladesh Water Development Board under Ministry of Water Resources for retiring embankment construction of flashing inlets, sluice gate with a view to enhance crop production and fish cultivation inside the embankment by protecting overtopping of the flood water during high tide. The purpose of the project is to strengthen embankment, construct sluice gate, flashing inlets and formation of water management association with the project beneficiaries. Here KMC Ltd. worked as sub-consultant to DevCon Under this project, KMC Ltd conducted necessary social surveys and prepared Resettlement Plan (RP).

Description of Actual Services Provided by your Staff:

- Developed survey tools

- Conducted socioeconomic survey using structured questionnaire and visiting house to house

- Prepared sketch maps (not-to scale) for the proposed sites 

- Develop database based on survey data

- Prepared resettlement plan (RP)